| Date Completed: |
Summer 2007 |
| Cost: |
$320,000 |
| Designed By: |
In-house: City DES- Architecture & Engineering, Development Division |
| Constructed By: |
F.W. Construction |
| Project Description: |
This project added 2,200 linear feet of new trail to the Genesee Riverway Trail. An east-west pedestrian bridge connection was also constructed as a means to move people from one side of the breathtaking river gorge to the other. |